top of page
Jackie-Knabben-Ann-Ueno-Koppaka's House.jpg-28.jpg

STUDIO 790 BLOG POST

Your Essential Step-by-Step Guide for a Successful Home Renovation

  • 6 days ago
  • 3 min read

Modern kitchen with white cabinets, black marble countertops, vase with flowers. Checkered rug, gold accents, bright and spacious setting.

Renovating your home can feel overwhelming. You might wonder, what should I renovate first? or how do I create a renovation timeline that makes sense? The order in which you tackle home improvements affects your budget, timeline, and overall satisfaction with the final result. As an interior design studio with years of experience, we’ve helped countless homeowners navigate this process smoothly. This guide breaks down the best home renovation order and explains how a full-service design studio like Studio 790, can simplify your journey.




Why the Order of Renovation Matters


Renovating without a clear plan can lead to costly mistakes, delays, and frustration. For example, painting a room before fixing structural issues means you might damage fresh paint during repairs. Or installing new flooring before updating plumbing could force you to rip up brand-new floors. And yes, nobody wants that!


A well-planned renovation timeline helps you:


  • Avoid redoing work

  • Manage your budget effectively

  • Minimize disruption to your daily life

  • Ensure each step builds on the last


Understanding the interior design process and the typical home renovation order will give you confidence and control. So we are sharing 8 steps that can help you.



Step 1: Plan and Design with Professionals


Before swinging a hammer, start with a clear plan. This includes:


  • Defining your goals and priorities

  • Setting a realistic budget

  • Creating a detailed design concept

  • Scheduling the renovation timeline


Working with a full-service design studio, like us, at this stage is invaluable. Designers not only create beautiful, functional spaces but we also coordinate contractors, source materials, and anticipate challenges. This reduces surprises and keeps your project on track.



Step 2: Structural and Foundation Work


Begin with any structural repairs or foundation work. This might include:


  • Fixing cracks in walls or foundation

  • Reinforcing beams or joists

  • Addressing water damage or mold issues


These elements are the backbone of your home. Ignoring them can cause bigger problems later.



Step 3: Plumbing, Electrical, and HVAC Updates


Next, focus on the essential systems hidden behind walls:


  • Replace or upgrade plumbing pipes

  • Update electrical wiring and outlets

  • Install or service heating, ventilation, and air conditioning (HVAC) systems


This step is critical because these systems affect safety and comfort. It’s easier and more cost-effective to do this before closing up walls or installing finishes.



Step 4: Insulation and Drywall Installation


Once the systems are in place, add insulation to improve energy efficiency. Then install drywall to create smooth, finished walls.


This step prepares your home for painting and decorating.



Step 5: Flooring Installation


Install flooring after drywall but before painting in some cases, depending on the type of flooring and paint. For example, hardwood floors are often installed before painting to avoid paint spills on finished floors. Tile or carpet might come later.


Discuss this with your design team to decide the best sequence for your materials.



Step 6: Painting and Wall Treatments


With floors installed, paint walls and ceilings. This includes:


  • Primer and paint coats

  • Wallpaper or other wall treatments


Painting after flooring installation protects your floors and ensures a clean finish.



Step 7: Cabinetry, Fixtures, and Trim


Install kitchen and bathroom cabinets, countertops, and fixtures such as sinks and faucets. Add trim, baseboards, and molding to complete the look.


This step brings your design vision to life with functional and decorative elements.



Step 8: Final Touches and Decor


Finish with lighting fixtures, hardware, window treatments, and furniture placement. This is when your home truly feels complete.



How a Full-Service Design Studio Simplifies Your Renovation


Managing all these steps can be stressful. A full-service design studio acts as your project partner by:


  • Creating a clear renovation timeline tailored to your home

  • Coordinating contractors and deliveries

  • Handling permits and inspections

  • Offering expert advice on materials and finishes

  • Ensuring the design vision stays consistent from start to finish


Our team guides you through every phase, so you avoid costly mistakes and enjoy the process.



Get Your Free Home Renovation Checklist


To help you get started, we created a handy free downloadable checklist that outlines the entire renovation and important things to consider. This checklist will keep you organized and informed.


Click here to download your free home renovation checklist!


If this helped you think about your renovation differently, you don’t have to figure it out alone.

We’d love to help you create a plan that supports your home, your routines, and your next season of life.



 
 
 

Comments


bottom of page